The SASB indicators for the Engineering and Construction Services sector are presented below:
TOPIC |
METRIC |
SASB CODE |
REFERENCE / DIRECT ANSWER |
---|---|---|---|
Environmental Impacts of Project Development |
Number of incidents of non-compliance with environmental permits, standards, and regulations |
IF-EN-160a.1 |
See GRI 307-1 indicator |
Discussion of processes to assess and manage environmental risks associated with project design, siting, and construction |
IF-EN-160a.2 |
See Environment section, pages 92-94 |
|
Structural Integrity & Safety |
Amount of defect- and safety-related rework costs |
IF-EN-250a.1 |
7.87 million euros |
Total amount of monetary losses as a result of legal proceedings associated with defect- and safety-related incidents |
IF-EN-250a.2 |
25,061.67 euros |
|
Workforce Health & Safety |
(1) Total recordable incident rate (TRIR) and (2) fatality rate for (a) direct employees and (b) contract employees |
IF-EN-320a.1 |
See appendix to GRI indicators, indicators 403-9 and 403-10. |
Lifecycle Impacts of Buildings & Infrastructure |
Number of (1) commissioned projects certified to a third-party multi-attribute sustainability standard and (2) active projects seeking such certification |
IF-EN-410a.1 |
See Annex to GRI indicators, indicator CRE8 |
Discussion of process to incorporate operational-phase energy and water efficiency considerations into project planning and design |
IF-EN-410a.2 |
See Environment section, pages 92-94 |
|
Climate Impacts of Business Mix |
Amount of backlog for (1) hydrocarbon related projects and (2) renewable energy projects |
IF-EN-410b.1 |
The portfolio of projects related to hydrocarbons amounts to 41.9 million euros, corresponding to gas pipelines and other fuel storage infrastructures.
As for the renewable energy project portfolio, it amounted to 1.5 million euros. Ferrovial also has the necessary licenses and authorizations to build and operate a 50 MWp photovoltaic plant, which will come into operation in 2023. |
Amount of backlog cancellations associated with hydrocarbon-related projects |
IF-EN-410b.2 |
There were no portfolio cancellations associated with hydrocarbon projects. |
|
Amount of backlog for non-energy projects associated with climate change mitigation |
IF-EN-410b.3 |
See Taxonomy section, pages 24 and 150-153 |
|
Business Ethics |
(1) Number of active projects and (2) backlog in countries that have the 20 lowest rankings in Transparency International’s Corruption Perception Index |
IF-EN-510a.1 |
Ferrovial does not develop projects in any of the 20 countries ranked in the bottom 20 of the Corruption Perceptions Index. |
Total amount of monetary losses as a result of legal proceedings associated with charges of (1) bribery or corruption and (2) anticompetitive practices |
IF-EN-510a.2 |
See Consolidated Financial Statements, note 6.5. |
|
Description of policies and practices for prevention of (1) bribery and corruption, and (2) anti-competitive behavior in the project bidding processes |
IF-EN-510a.3 |
See Integrity section, pages 88-89 |